Example: Iron Works, Inc.
Mathematical Model (continued)
- The total amount of steel used during monthly production =
(steel required per unit of product 1)
x (monthly production of product 1)
+ (steel required per unit of product 2)
x (monthly production of product 2)
= a1x1 + a2x2
This quantity must be less than or equal to the allocated b pounds of steel: